My dad (and my General Contractor) is in town for Thanksgiving, so I have two weeks to get things over my skill set done at the house before he leaves for his annual trip to Asia.  The goal is to get all the framing done, replace the bad floor joist in the basement, reinstall the floor in the 1st floor bath, so the tub can be returned and install the LVL beam, so the load barring wall separating the kitchen and dining room could be removed.

With the help of Cameron (my Demo King cousin) we were able to get the load barring wall removed.  We had a bit of a rough start.  My dad miss measured the first LVL beam and cut it 2′ too short.  That mistake cost me $100 as I had to buy a new one, but fortunately I discovered a great lumber yard located within 3 miles of the house, Forge Lumber.  They stocked the right size and since the distance was short (original LVL and all my lumber needs was delivered by McCabe Lumber located near Kings Island), I pulled a Macguyver and somehow got the beam in my PT Cruiser in a safe enough fashion that allowed me to drive it back to the house.  That saved me another $100 bucks by avoiding renting a truck or paying another delivery fee and even more valuable, time, since a delivery would mean waiting another day.  I wish I had more pictures (can’t believe I didn’t take a picture of my PT with a 16′ x 14″ beam sticking out the back), but this was a three person job, so all I can present is the finished product.

1 Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s